TEL: 0086-511-88229828 EMAIL: info@santacc.com

Warmly congratulate the successful shipment of the first batch of Electric Desalter tanks for Guangdong Petrochemical 20million tons refining and chemical integration project

Sort:Company News Release time:2021-04-09 522Views

Come, come on looking at Santacc Energy! It is great!

On April 6 afternoon, by the order of Site Commander, the first Electric Desalter tank with a length of 52 meters (more than 420 tons)was slowly lifted and then transported by SPMT Trailer to the Yangtze Zhengjiang dock, finally to be lifted onto barge board.  

Through months of hard work, 20million tons/year large-scale electric desalination equipment Fabricated by our SANTACC Energy Company has been successively completed and entered the state of being ready for delivery.

This project is with total number of 6 tanks, according to customer requirements, now first batch delivery three small tanks , they are just 3 “battleships”. Let us to be desirable for the second batch delivery 3 largest tanks with 70 meters long, exceeding 750 tons, they will be called “aircraft” in China Electric Desalter Industry.

Previous:Safety is more significant than Mountain Taishan -- SANTACC Energy carried out emergency rescue drill in confined space

Next:SANTACC held the commencement ceremony of Guangdong Petrochemical large-scale electric desalter project of 20 million tons/year